How Long Does a Renovation Take in Ontario? Realistic Timelines
The most common question we hear after “what will it cost?” is “how long will it take?”. Every home is different, but the stages are the same. Here is what to expect for typical projects in Mississauga and the GTA.
The four stages of every renovation
- Consultation and design: site visit, measurements, layout and 3D design, and a written quote.
- Permits and ordering: drawings are submitted to the city where a permit is required, and long-lead items such as cabinets and windows are ordered.
- Construction: demolition, framing, rough-in plumbing, electrical and HVAC, inspections, insulation, drywall, then finishes.
- Final inspection and handover: deficiency walkthrough, final city inspection where applicable, and cleanup.
Typical construction time by project
- Bathroom renovation: usually a few weeks of construction.
- Kitchen renovation: often several weeks, depending on cabinet lead times and layout changes.
- Basement finish: commonly several weeks once permits are approved, longer with a bathroom or kitchen.
- Legal basement apartment: longer, because of fire separation, separate exits and extra inspections.
- Full home renovation: a few months or more, depending on scope.
Design and permit time comes before these construction windows. Permit review times vary by city and season.
What slows projects down
- Decisions made after work starts, such as changing tile or layout.
- Late material deliveries, especially custom cabinets and windows.
- Hidden problems found during demolition, such as old wiring or water damage.
- Failed or delayed inspections.
- Missing permits, which can stop work entirely.
How to keep your renovation on schedule
- Finalise every selection before demolition.
- Order long-lead items early.
- Work with a contractor who books inspections and trades in the right order.
- Keep one point of contact so questions are answered the same day.
At Brickstone we give you a written schedule at the start and keep you updated at each stage, so you always know what is happening next.
Frequently Asked Questions
How long does a kitchen renovation take?
Construction for a typical kitchen often takes several weeks. Custom cabinet lead times and layout changes are the biggest factors.
How long does a bathroom renovation take?
A standard bathroom renovation usually takes a few weeks of construction once materials are on site.
Can I live at home during a renovation?
For most single-room projects, yes. For a full home renovation or major kitchen work, many families arrange temporary accommodation or a temporary kitchen.
How long do building permits take in the GTA?
It depends on the city, the project and the time of year. Your contractor should factor permit review into the schedule before giving you a start date.